There are two sets of overhead variances: variable and fixed.
The variable variances are caused by the overhead application rate and the activity level against which the rate was applied.
The variable overhead rate variance is the difference between the actual variable manufacturing overhead and the variable overhead that was expected given the number of hours worked.
The variable overhead efficiency variance is driven by the difference between the actual hours worked and the standard hours expected for the units produced.
There are two fixed overhead variances. One is caused by spending too much or too little on fixed overhead. The other is caused by actual production being above or below the expected production level.